Vitetta, an architectural and engineering firm, recently concluded a study of M.R. Reiter and Grand-view elementary schools in Morrisville School District.
A recommendation was made at a special public hearing on Jan. 29: if any school is going to be used for an elementary school, Grandview Elementary School is the better choice from a physical standpoint.
Bill Corfield, a regional director of Vitetta, said his firm was directed to conduct a study, comparing M.R. Reiter and Grandview in order to determine which school is in "better condition."
The auditorium at the Morrisville Middle/Senior High School was sparsely filled with parents, mostly who were asking if the Morrisville School Board has any long-range plans about displaced schoolchildren from M.R. Reiter Elementary School. A public hearing was held to give the community a chance to voice their opinions.
Reiter was closed in mid-December after a furnace exploded on the weekend. The Morrisville School Board is considering whether to close the school permanently.
As a result, the children who were displaced from M.R. Reiter were sent either to Grandview or the Morrisville Middle/Senior High School.
Vitetta's study was conducted prior to the explosion. At M.R. Reiter, the firm had checked the heating units, boilers, electric, plumbing, exhaust fans and lighting.
According to Vitetta's Corfield, M. R. Reiter does not have handicap accessibility. He noted that Reiter is 2 1/2 stories high and that it is "hard to get around the building." Grandview is one floor.
"When planning an elementary school, it is always advantageous to have it on one floor," Corfield said.
He noted there is a water problem in the multi-purpose room at Reiter. "We have some major concerns about the amount of water and how to stop it," he said, noting the source of the water is unknown. The floor had to be replaced once because of the problem.
Corfield explained, "because of the water entry, the building is settling. Major cracks have been there. They're not getting any better."
"The Grandview School is in better condition," he said. "We did not see cracks or water infiltration in Grand-view."
Reiter sits on about three acres at the corner of Harper and Clymer avenues. The square footage for the entire building is 46,200 and it is zoned CS-1 (Community Service District.)
The current estimated insurance loss due to the furnace explosion is $1.15 million. "It's growing as we speak," said Paul DeAngelo, business manager for the school district.
"They're still in the process of cleaning the building," he said.
Meanwhile, he said after the meeting that the Morrisville School District entered into an appraisal agreement on Dec. 7 with Gleason Real Estate.
The value of the building and the land at Reiter is estimated at $995,000.
DeAngelo gave some history about Reiter, which previously was the site of the Robert Morris High School and was built on the site in 1924.
In 1959, the school was destroyed by fire. Later, it was rebuilt as M.R. Reiter Elementary School.
DeAngelo said the last record about the furnace was recorded in 1959. "They're well over 40 years old. They should have been replaced twice," he said.
The clean-up at Reiter continues. Teachers have received the supplies and materials from their classrooms. The clean-up company is focusing on the content first and the building last.
"What's still there are desks and filing cabinets," DeAngelo said. They are being cleaned and will be taken to the modular classrooms at Grandview Elementary by Feb. 20.
"The clean up is going pretty much as we thought," he said. "It's a slow process because it's the entire building.
The insurance claim is for $1.15 million. DeAngelo said a big chunk is the modular classrooms. Leasing eight modular classrooms with bathrooms will cost $500,000, he noted.
The insurance company sent a forensic engineer. "His recommendation is to replace the boilers," DeAn-gelo explained. "The school district will put it out to bid to determine the costs-we're estimating $300,000 for two boilers."
Other big-ticket items, he said, include the clean up for $93,000. Some computers are being tested, which will cost $134,000.
"We have a whole list of miscellaneous items from staff time, to the windows that got blown out to cleaning and inspection," DeAngelo added.
The cost to renovate and install a new furnace at Reiter would be $4 million. Meanwhile, the cost to renovate Grandview Elementary School is $2.6 million.
The modulars are being installed and will be finished Feb. 20, according to DeAngelo. "The snow and ice put us behind."
He said the immediate priority is getting the modular classrooms installed at Grandview, where some of the Reiter children are going since the blast.
In the summer, the school district could "look at the possibility of bringing the fourth grade to the high school," DeAngelo indicated, stressing that plan could be contingent upon the board's decision whether or not to close M.R. Reiter.
DeAngelo also talked about what could happen if the board ultimately votes to close Reiter. The long-term plan, according to the business manager, could be to create an intermediate high school for fourth-to eighth-grade. That group could be sectioned off from 9th-to 12th-graders. K-3 could be at Grandview.
Showing posts with label Vitetta. Show all posts
Showing posts with label Vitetta. Show all posts
Wednesday, February 11, 2009
Wednesday, February 4, 2009
Parents criticize board in writing
From the BCCT.
Parents criticize board in writing
By MANASEE WAGH
Morrisville residents have written letters to school officials expressing fears for the district’s future.
“I demand to know what is in store for my children’s education and most importantly their proper safety?!” parent Tammi Bresnen wrote.
Five people responded to district solicitor Michael Fitzpatrick’s encouragement for additional written testimony after a Jan. 29 public hearing about the closing of M.R. Reiter Elementary School.
“It’s not a lot, but it’s not bad,” board member John Buckman said of the number of people who wrote.
Bresnen and other residents criticized the board for poor communication with the public.
“This board has shown time and time again that it does not act with a publicly discussed, debated, and enacted long-term strategic plan in place. It acts in fits and starts without an overarching goal,” wrote parent Kevin Leather.
The board plans to refurbish Grandview, the district’s other elementary school, and it’s investigating putting grades kindergarten through eight in the high school building. Leather called those two initiatives “opposing avenues of action.”
Resident Carol J. Bargery proposed renovating Reiter and selling Grandview. Morrisville could send grades kindergarten through eight to the high school and grades nine through 12 to Reiter, she wrote. The district should hold a public referendum before closing Reiter or any other building, she suggested.
About 250 students attend Morrisville Middle/Senior High School in grades nine through 12. Until a December furnace explosion, Reiter housed more than 250 students.
They are sharing space currently with other students in various district buildings for at least the rest of the school year. The explosion is not the sole rationale for closing the school. Board members had planned to close at least one elementary school in the district and use the money from its sale to renovate the district’s two other school buildings. The Reiter incident and an earlier evaluation of the building provided the board justification to pick Reiter for closing.
About 20 people expressed their opinions verbally at the public hearing. Then residents had until 3 p.m. on Feb. 2 to submit written opinions as part of the public hearing record.
Representatives from Vitetta, the engineering and architectural firm hired to evaluate the district schools, said at the public hearing that Reiter was in worse shape than Grandview Elementary. It has serious cracking in the walls and water seepage indoors.
“To fix that building doesn’t seem too probable at this point. Whatever the testimony’s saying, we have to look at the problems,” said Buckman. He said he sympathized with parents who expressed frustration with Reiter’s issues.
Morrisville is installing eight modular units on Grandview’s property this month to give some of the displaced students their own space. Bad weather has delayed the units’ installation, Superintendent Elizabeth Yonson said last week.
The district has reserved $7.4 million for renovations to the high school and one elementary school.
Vitetta is about to start the design phase of window and boiler renovations for the high school. The work shouldn’t cost more than $4.8 million, said district business administrator Paul DeAngelo.
Since Reiter may be closed, Grandview is next on the list to be renovated. Vitetta’s current estimate for fixing the smaller Grandview is $2.6 million. Resolving Reiter’s problems would cost about $4 million, according to the company.
The board can only make a decision about closing a school building 90 days after the public hearing, according to school code.
“Our board will come to a well thought out decision about what is best for our educational program, the children and the taxpayers and hopefully satisfy most of the community,” board President William Hellmann wrote in an e-mail exchange Tuesday.
Bargery hopes the board will be more candid about its thinking.
“Maybe if you would be more open and forthright with the community the community would reach out, and when Americans work together there is nothing we can’t do,” she wrote.
Parents criticize board in writing
By MANASEE WAGH
Morrisville residents have written letters to school officials expressing fears for the district’s future.
“I demand to know what is in store for my children’s education and most importantly their proper safety?!” parent Tammi Bresnen wrote.
Five people responded to district solicitor Michael Fitzpatrick’s encouragement for additional written testimony after a Jan. 29 public hearing about the closing of M.R. Reiter Elementary School.
“It’s not a lot, but it’s not bad,” board member John Buckman said of the number of people who wrote.
Bresnen and other residents criticized the board for poor communication with the public.
“This board has shown time and time again that it does not act with a publicly discussed, debated, and enacted long-term strategic plan in place. It acts in fits and starts without an overarching goal,” wrote parent Kevin Leather.
The board plans to refurbish Grandview, the district’s other elementary school, and it’s investigating putting grades kindergarten through eight in the high school building. Leather called those two initiatives “opposing avenues of action.”
Resident Carol J. Bargery proposed renovating Reiter and selling Grandview. Morrisville could send grades kindergarten through eight to the high school and grades nine through 12 to Reiter, she wrote. The district should hold a public referendum before closing Reiter or any other building, she suggested.
About 250 students attend Morrisville Middle/Senior High School in grades nine through 12. Until a December furnace explosion, Reiter housed more than 250 students.
They are sharing space currently with other students in various district buildings for at least the rest of the school year. The explosion is not the sole rationale for closing the school. Board members had planned to close at least one elementary school in the district and use the money from its sale to renovate the district’s two other school buildings. The Reiter incident and an earlier evaluation of the building provided the board justification to pick Reiter for closing.
About 20 people expressed their opinions verbally at the public hearing. Then residents had until 3 p.m. on Feb. 2 to submit written opinions as part of the public hearing record.
Representatives from Vitetta, the engineering and architectural firm hired to evaluate the district schools, said at the public hearing that Reiter was in worse shape than Grandview Elementary. It has serious cracking in the walls and water seepage indoors.
“To fix that building doesn’t seem too probable at this point. Whatever the testimony’s saying, we have to look at the problems,” said Buckman. He said he sympathized with parents who expressed frustration with Reiter’s issues.
Morrisville is installing eight modular units on Grandview’s property this month to give some of the displaced students their own space. Bad weather has delayed the units’ installation, Superintendent Elizabeth Yonson said last week.
The district has reserved $7.4 million for renovations to the high school and one elementary school.
Vitetta is about to start the design phase of window and boiler renovations for the high school. The work shouldn’t cost more than $4.8 million, said district business administrator Paul DeAngelo.
Since Reiter may be closed, Grandview is next on the list to be renovated. Vitetta’s current estimate for fixing the smaller Grandview is $2.6 million. Resolving Reiter’s problems would cost about $4 million, according to the company.
The board can only make a decision about closing a school building 90 days after the public hearing, according to school code.
“Our board will come to a well thought out decision about what is best for our educational program, the children and the taxpayers and hopefully satisfy most of the community,” board President William Hellmann wrote in an e-mail exchange Tuesday.
Bargery hopes the board will be more candid about its thinking.
“Maybe if you would be more open and forthright with the community the community would reach out, and when Americans work together there is nothing we can’t do,” she wrote.
Friday, January 30, 2009
Morrisville parents want long-term plan
From the BCCT.
What a shock. We want a plan. That's the first time I've heard about that request...NOT!
One of our own borough councilmen lost total control at a school board meeting once shouting "Shame! Shame!" at the late Ed Frankenfield. Mr. Frankenfield's crime? Demanding a plan from the Emperor. (Side note to all who have heard about the Emperor's removal of public speakers from the January 28 meeting because they were disruptive. Not only did he not stop Mr. Worob, he applauded Mr. Worob's comments when they were concluded.)
Do you get it now, your Lord Highness? Where is the plan?
Be sure to send your written comments on the closure plan by Monday at 3:00 P.M. The Emperor and Solicitor Fitzpatrick promised answers to the questions posed.
Morrisville parents want long-term plan
Residents are encouraged to submit written opinions about the proposed closing of M.R. Reiter Elementary by Monday.
By MANASEE WAGH
Whether or not their district is one school short, residents would like to see a long-term plan for Morrisville’s children.
People scattered across the auditorium at the Morrisville Middle/Senior High School listened as about 20 residents, most of them parents, give testimony during a public hearing Thursday evening to close M.R. Reiter Elementary School.
Parents expressed frustration with a December furnace explosion that has required the roughly 250 Reiter students to attend class in various district locations, including the high school. Starting next month, modular units will be installed on Grandview Elementary’s property for grades one and two.
“What are you going to do next? How do we address the children’s safety, especially if we put kindergarten kids with high school kids?” said resident Kevin Waters.
Various parents said they laud the administration’s efforts to continue their children’s education during the emergency, but denounce the board’s lack of full disclosure about a long-term plan if Reiter is permanently closed.
“I’d like to see what they promised during the campaign, that they were going to work on education and safety,” said Susan Hough, the parent of a child at Reiter.
Ed Bailey, the father of a child in the district, said he’d like to see a referendum to decide whether or not Reiter should be closed.
“I don’t want see-sawing. We should come up with a reasonable compromise that most voters will support. There’s been a lot of anger, and I’d like to see us come together,” he said.
The two boilers in the aging building are about 50 years old and should have been replaced twice during their lifetime, said Paul DeAngelo, the district’s business administrator, at the hearing.
Reiter is in poor shape, with cracking that allows water to seep into the building and some features that date back to the 1920s, said Bill Corfield, a representative from Vitetta, an architectural and engineering firm that performed an assessment of the district’s two elementary schools, Reiter and the smaller Grandview.
If the Reiter building and property are sold, the remaining two schools could use the money for renovation, board President William Hellmann has said. Vitetta is starting the design phase for renovating the high school soon and the board has directed the firm to look at fixing problems in Grandview as well.
Renovating Reiter’s structural issues and physical systems, including windows, boilers, electrical, plumbing and lighting, would cost about $4 million. Renovating Grandview would cost about $2.6 million.
“Grandview is not large enough for the children we have. I haven’t seen a long-term plan to place students,” said Johanny Manning, a former school board member who has a child in Reiter. She said the cur rent situation crams elementary students into makeshift classrooms, and doesn’t allow for proper instruction in either core subjects or extras, like music or art.
After the hearing, the board cannot make any decisions about closing Reiter for at least 90 days, according to the school code. District solicitor Michael Fitzpatrick encouraged residents to submit written opinions about the proposed closing by Monday, Feb. 2 at 3 p.m. to contribute to the public hearing record. The opinions can be given to the administrative offices at 550 West Palmer St.
Financial problems have plagued the district for years, with previous boards trying different options to provide a quality education in better buildings. The current board is looking into possibly housing preK though grade eight in the high school building, a plan that requires sending grades nine through 12 to other districts on a paid tuition basis.
Fitzpatrick said at the Wednesday board meeting that he has not gotten “entirely positive” responses from neighboring districts about this proposition.
About 855 students currently attend school in Morrisville’s three buildings.
Though parent Elvin Velez did not give testimony at the hearing, he said he’d like to see a consolidated school done properly.
“As a taxpayer, it could be cumbersome, but that’s the nature of the beast,” he said. “We could pull through this as a community to find solutions.”
What a shock. We want a plan. That's the first time I've heard about that request...NOT!
One of our own borough councilmen lost total control at a school board meeting once shouting "Shame! Shame!" at the late Ed Frankenfield. Mr. Frankenfield's crime? Demanding a plan from the Emperor. (Side note to all who have heard about the Emperor's removal of public speakers from the January 28 meeting because they were disruptive. Not only did he not stop Mr. Worob, he applauded Mr. Worob's comments when they were concluded.)
Do you get it now, your Lord Highness? Where is the plan?
Be sure to send your written comments on the closure plan by Monday at 3:00 P.M. The Emperor and Solicitor Fitzpatrick promised answers to the questions posed.
Morrisville parents want long-term plan
Residents are encouraged to submit written opinions about the proposed closing of M.R. Reiter Elementary by Monday.
By MANASEE WAGH
Whether or not their district is one school short, residents would like to see a long-term plan for Morrisville’s children.
People scattered across the auditorium at the Morrisville Middle/Senior High School listened as about 20 residents, most of them parents, give testimony during a public hearing Thursday evening to close M.R. Reiter Elementary School.
Parents expressed frustration with a December furnace explosion that has required the roughly 250 Reiter students to attend class in various district locations, including the high school. Starting next month, modular units will be installed on Grandview Elementary’s property for grades one and two.
“What are you going to do next? How do we address the children’s safety, especially if we put kindergarten kids with high school kids?” said resident Kevin Waters.
Various parents said they laud the administration’s efforts to continue their children’s education during the emergency, but denounce the board’s lack of full disclosure about a long-term plan if Reiter is permanently closed.
“I’d like to see what they promised during the campaign, that they were going to work on education and safety,” said Susan Hough, the parent of a child at Reiter.
Ed Bailey, the father of a child in the district, said he’d like to see a referendum to decide whether or not Reiter should be closed.
“I don’t want see-sawing. We should come up with a reasonable compromise that most voters will support. There’s been a lot of anger, and I’d like to see us come together,” he said.
The two boilers in the aging building are about 50 years old and should have been replaced twice during their lifetime, said Paul DeAngelo, the district’s business administrator, at the hearing.
Reiter is in poor shape, with cracking that allows water to seep into the building and some features that date back to the 1920s, said Bill Corfield, a representative from Vitetta, an architectural and engineering firm that performed an assessment of the district’s two elementary schools, Reiter and the smaller Grandview.
If the Reiter building and property are sold, the remaining two schools could use the money for renovation, board President William Hellmann has said. Vitetta is starting the design phase for renovating the high school soon and the board has directed the firm to look at fixing problems in Grandview as well.
Renovating Reiter’s structural issues and physical systems, including windows, boilers, electrical, plumbing and lighting, would cost about $4 million. Renovating Grandview would cost about $2.6 million.
“Grandview is not large enough for the children we have. I haven’t seen a long-term plan to place students,” said Johanny Manning, a former school board member who has a child in Reiter. She said the cur rent situation crams elementary students into makeshift classrooms, and doesn’t allow for proper instruction in either core subjects or extras, like music or art.
After the hearing, the board cannot make any decisions about closing Reiter for at least 90 days, according to the school code. District solicitor Michael Fitzpatrick encouraged residents to submit written opinions about the proposed closing by Monday, Feb. 2 at 3 p.m. to contribute to the public hearing record. The opinions can be given to the administrative offices at 550 West Palmer St.
Financial problems have plagued the district for years, with previous boards trying different options to provide a quality education in better buildings. The current board is looking into possibly housing preK though grade eight in the high school building, a plan that requires sending grades nine through 12 to other districts on a paid tuition basis.
Fitzpatrick said at the Wednesday board meeting that he has not gotten “entirely positive” responses from neighboring districts about this proposition.
About 855 students currently attend school in Morrisville’s three buildings.
Though parent Elvin Velez did not give testimony at the hearing, he said he’d like to see a consolidated school done properly.
“As a taxpayer, it could be cumbersome, but that’s the nature of the beast,” he said. “We could pull through this as a community to find solutions.”
Labels:
Bailey,
DeAngelo,
Frankenfield Question,
Hellmann,
Reiter shut down,
Vitetta
Saturday, December 20, 2008
Hellmann Removes M.R. Reiter Without Authorization
Let's not forget this gem either.
On June, 12 companies submitted proposals to work on all three school buildings. Bill Hellmann, the board president, later cut that down to five and removed M. R. Reiter from the equation without consulting the rest of the board, said board member Robin Reithmeyer at Tuesday's board meeting.
She voted against going forward on the boiler replacements without a plan that included all three schools.
Where's all the "safety of the students" protests now?
District takes steps toward restoring schools
By MANASEE WAGH
Bucks County Courier Times
MORRISVILLE -- After several decades, it's time to initiate serious updates in Morrisville schools, say area residents.
The school board recently voted 7-1 to start preliminary work to replace the boilers in the high school building and Grandview Elementary.
Some school board members and residents call it the first step toward restoring the schools, which have been in need of repairs for years.
“This is the beginning of something. People should applaud this beginning,” said resident Sharon Hughes.
The district will use Vitetta, a Philadelphia-based architectural and engineering corporation, to begin assessing the work necessary to replace the boilers, as well as looking into two new burners for the elementary school.
Morrisville residents have been calling for a plan to get the deteriorating high school and both elementaries in better shape since the current board canceled plans to build a consolidated K-12 school.
But there's a problem with taking action on the boilers now, the board minority said.
Evaluating the needs of two schools, designing a custom boiler for each and completing installation could take six months. That would put the project's conclusion well into the heating season, according to Tim Lastichen, district facilities director.
The price tag for the boilers alone is more than $100,000, not counting the labor and any expenses that could crop up along the way, he said at the Tuesday board meeting.
Some residents and the board minority complained this is a poor time to start an expensive project without a long-term restoration plan that would take the schools' many other problems into account.
In May, the board voted to hire Wick Fisher White, an engineering firm, to do a $30,000 study of the work needed at the high school and two elementaries. The next step was to advertise for several companies to do that work.
On June, 12 companies submitted proposals to work on all three school buildings. Bill Hellmann, the board president, later cut that down to five and removed M. R. Reiter from the equation without consulting the rest of the board, said board member Robin Reithmeyer at Tuesday's board meeting.
She voted against going forward on the boiler replacements without a plan that included all three schools.
However, some board members and residents attending the meeting thought it was a bad idea to wait any longer.
“The reason for moving forward is to address an important item,” said board member Brenda Worob, referring to the boilers.
Plus, part of the original $30 million bond that the previous board borrowed to fund a consolidated school needs to be spent soon, Hellmann said.
Board member William Farrell suggested the district not delay the boiler project just because it would take a long time. Maybe the district wouldn't complete it in time for this year's cold season, but at least the preparation work would be done, he said.
As for the second elementary school, M. R. Reiter, Lastichen didn't think it was worth investing in a new boiler, though residents complained that it was too cold for comfort there during the winter.
“Reiter's so bad, I think it should be bulldozed. I wouldn't spend money on it,” Lastichen said during the meeting.
M.R. Reiter's future is still up in the air.
In May, Hellmann unveiled a tentative plan to save money by combining the schools somehow, but no clear action has been taken in that direction yet.
A temporary fix for providing heat in the winter may be to bring modular heaters into Reiter and the other schools, said board member John Buckman.
The district will hold a community action plan meeting at 7 p.m. July 22, in the LGI room of the high school to discuss the boilers and other issues. Residents are encouraged to participate.
Manasee Wagh can be reached at 215-949-4206 or mwagh@phillyBurbs.com.
July 19, 2008 6:27 AM
On June, 12 companies submitted proposals to work on all three school buildings. Bill Hellmann, the board president, later cut that down to five and removed M. R. Reiter from the equation without consulting the rest of the board, said board member Robin Reithmeyer at Tuesday's board meeting.
She voted against going forward on the boiler replacements without a plan that included all three schools.
Where's all the "safety of the students" protests now?
District takes steps toward restoring schools
By MANASEE WAGH
Bucks County Courier Times
MORRISVILLE -- After several decades, it's time to initiate serious updates in Morrisville schools, say area residents.
The school board recently voted 7-1 to start preliminary work to replace the boilers in the high school building and Grandview Elementary.
Some school board members and residents call it the first step toward restoring the schools, which have been in need of repairs for years.
“This is the beginning of something. People should applaud this beginning,” said resident Sharon Hughes.
The district will use Vitetta, a Philadelphia-based architectural and engineering corporation, to begin assessing the work necessary to replace the boilers, as well as looking into two new burners for the elementary school.
Morrisville residents have been calling for a plan to get the deteriorating high school and both elementaries in better shape since the current board canceled plans to build a consolidated K-12 school.
But there's a problem with taking action on the boilers now, the board minority said.
Evaluating the needs of two schools, designing a custom boiler for each and completing installation could take six months. That would put the project's conclusion well into the heating season, according to Tim Lastichen, district facilities director.
The price tag for the boilers alone is more than $100,000, not counting the labor and any expenses that could crop up along the way, he said at the Tuesday board meeting.
Some residents and the board minority complained this is a poor time to start an expensive project without a long-term restoration plan that would take the schools' many other problems into account.
In May, the board voted to hire Wick Fisher White, an engineering firm, to do a $30,000 study of the work needed at the high school and two elementaries. The next step was to advertise for several companies to do that work.
On June, 12 companies submitted proposals to work on all three school buildings. Bill Hellmann, the board president, later cut that down to five and removed M. R. Reiter from the equation without consulting the rest of the board, said board member Robin Reithmeyer at Tuesday's board meeting.
She voted against going forward on the boiler replacements without a plan that included all three schools.
However, some board members and residents attending the meeting thought it was a bad idea to wait any longer.
“The reason for moving forward is to address an important item,” said board member Brenda Worob, referring to the boilers.
Plus, part of the original $30 million bond that the previous board borrowed to fund a consolidated school needs to be spent soon, Hellmann said.
Board member William Farrell suggested the district not delay the boiler project just because it would take a long time. Maybe the district wouldn't complete it in time for this year's cold season, but at least the preparation work would be done, he said.
As for the second elementary school, M. R. Reiter, Lastichen didn't think it was worth investing in a new boiler, though residents complained that it was too cold for comfort there during the winter.
“Reiter's so bad, I think it should be bulldozed. I wouldn't spend money on it,” Lastichen said during the meeting.
M.R. Reiter's future is still up in the air.
In May, Hellmann unveiled a tentative plan to save money by combining the schools somehow, but no clear action has been taken in that direction yet.
A temporary fix for providing heat in the winter may be to bring modular heaters into Reiter and the other schools, said board member John Buckman.
The district will hold a community action plan meeting at 7 p.m. July 22, in the LGI room of the high school to discuss the boilers and other issues. Residents are encouraged to participate.
Manasee Wagh can be reached at 215-949-4206 or mwagh@phillyBurbs.com.
July 19, 2008 6:27 AM
Thursday, December 18, 2008
Vitetta Report Available
Now not just for the select elect of the Emperor, the Vitetta Report is available at the district website.
Oddly enough...it reads pretty much like the 2005 report.
You can view the whole group of reports here.
Oddly enough...it reads pretty much like the 2005 report.
You can view the whole group of reports here.
Is the High School Safe?
The 2005 buildings report also addressed the Middle-Senior High School, the building where most of our children are now located.
We anxiously await the (drum roll please) VITETTA REPORT! Yes, the answer to all our problems, Vitetta will swoop in and tell us what to do.
Let's see if this report gets distributed.
UPDATED: The Vitetta Report is available at the district website.
3.0 Morrisville High School
Executive Summary
With the exception of the main sanitary, fire alarm, security, public address, data and clock systems, the mechanical and electrical systems have exceeded their expected service lives and require replacement. Depending on the new program, portions of the emergency lighting and electrical distribution systems can be retained.
3.1 Heating, Ventilating and Air Conditioning Systems and Equipment
3.1.1 Unit Ventilators and Air Handling Units
General:
• The majority of the classrooms, both in the original 1958 Building and the 1972 Addition are served by unit ventilators with hot water heating coils and ventilation air provisions. Ventilation is obtained both through the roof and through louvers on the exterior walls.
• Larger spaces, such as the gym, kitchen and the Instructional Materials Center are served by ducted air handling units with a hot water heating coil and outdoor air louvers.
Age/Condition:
• The unit ventilators, air handling units and ductwork are over thirty years old and have far exceeded their useful service lives.
Code Issues:
• Not applicable.
Suitability for General Reuse:
• The unit ventilators, air handling units and ductwork systems are not suitable for reuse and must be replaced.
3.1.2 Boilers
General:
• Two oil-fired boilers, which serve HVAC equipment in the original 1968 Building, generate heating water for classroom and corridor heating. Refer to Photograph C1 in Appendix “C”.
• Two oil-fired boilers, which were installed during the 1972 Addition, generate steam to serve heat exchangers. The heat exchangers use the boiler steam to provide heating water for the classrooms, corridors, and office spaces. Refer to Photograph C2 in Appendix “C”.
• Two base-mounted pumps circulate the heating water throughout the 1968 Building.
Refer to Photograph C3 in Appendix “C”.
Age/Condition:
• The boilers and heat exchangers are all over thirty years old and at the end of their useful service lives.
• The base-mounted pumps appear to be approximately five years old, in fair condition, and can be expected to last another ten to fifteen years.
Code Issues:
• There are not apparent code issues related to the base-mounted pumps.
Suitability for General Reuse:
• The boilers and heat exchangers, have exceeded their useful lives, are not suitable for reuse or continued use, and must be replaced.
• The pumps are not suited for new energy efficient HVAC systems required by a new program of space use, and must be replaced.
3.1.3 Cooling System
General:
• An existing air handling unit, which serves the Instructional Materials Center was retrofitted with a cooling coil and remote condensing unit in 1996. The dedicated condensing unit, rated for 30 tons cooling, is located in the open courtyard adjacent to the Instructional Materials Center.
• A 5-ton rooftop unit, installed in 1995, serves a conference room and the Business Manager’s Office Area.
• A 10-ton split system, installed in 1997, serves several offices on the west side of the open courtyard.
• Window air conditioners are incidental, have been added as piecemeal appliances at selective locations, and are not addressed further within this report.
Age/Condition:
• The existing air handling unit serving the Instructional Materials Center, as mentioned previously, is beyond it useful service life. Refer to Article 3.2.1 above.
• The 30-ton condensing unit, 5-ton rooftop unit and 10-ton split system are approximately ten years old and can be expected to last another five to eight years.
Code Issues:
• There are no apparent code issues related to the cooling system equipment.
Suitability for General Reuse:
• The 30-ton condensing unit, 5-ton rooftop unit and 10-ton split system, depending on the planned renovations and new program of space use at the existing unit locations, could be reused.
3.1.4 Underground Oil Tanks
General:
• There are two 12,000 gallon underground oil tanks, one located adjacent to each boiler room. Refer to Photograph C4 in Appendix “C”.
• Oil pumps, located at each boiler, supplies oil from the underground tank to the boilers.
Refer to Photograph C5 in Appendix “C”.
• A 5,000 gallon underground oil tank, which originally served an emergency generator, has been abandoned in-place.
Age/Condition:
• The oil tanks and pumps are over forty years old and have far exceeded their useful service lives.
Code Issues:
• Any repair work resulting from leaks will subject the overall system to compliance with stringent, expensive Federal Environmental Requirements. Prudent evaluation of existing tank/piping system integrity and lead free performance is recommended.
Suitability for General Reuse:
• The oil tanks and oil pumps are not suitable for reuse or continued use, and must be replaced.
3.1.5 Automatic Temperature Control System
General:
• Automatic temperature control system is pneumatic and served by multiple air compressors located in each Boiler Room.
Age/Condition:
• The control system appears to be over twenty years old and has far exceeded its useful service life.
Code Issues:
• Not applicable.
Suitability for General Reuse:
• The control system is not suitable for reuse or continued use, and must be replaced.
3.1.6 Exhaust Systems
General:
• General and toilet room exhaust is provided by roof mounted fans.
Age/Condition:
• The exhaust fans are over forty years old, have far exceeded their useful service lives, and are not meeting standard performance requirements.
Code Issues:
• Systems are unable to meet Pennsylvania State System Performance Requirements.
Suitability for General Reuse:
• The exhaust systems are not suitable for reuse and must be replaced.
3.2 Plumbing Systems and Equipment
3.2.1 Plumbing Fixtures
General:
• Plumbing fixtures consist of water closets, urinals, lavatories, showers, water coolers and hand sinks in various locations throughout the school. Refer to Photographs C6 and C7 in Appendix “C”.
Age/Condition:
• The majority of the plumbing fixtures appear to be at least thirty years old, have far exceeded their useful service lives, are in part faulty, and not capable of repair.
Code Issues:
• Systems are unable to meet Pennsylvania State System Performance Requirements.
Suitability for General Reuse:
• A majority of the plumbing fixtures are not suitable for continued use, much less reuse in an upgraded schoolhouse facility, and must be replaced.
3.2.2 Sanitary and Vent Piping
General:
• The piping is concealed in construction and was not directly observed. For the purposes of this report, it is assumed the piping is cast-iron and of original construction.
• There are no reported problems with the main building sewer.
Age/Condition:
• Sanitary and vent piping system is over thirty years old and has far exceeded its useful service life.
Code Issues:
• Not applicable.
Suitability for General Reuse:
• The domestic water piping is not suitable for reuse in an updated, modernized program of space use, and must be replaced.
• The Municipal Water Company should be consulted to determine suitability of overall property water service entrance for expansion of useful capacity.
3.2.3 Domestic Water Piping
General:
• The visible piping is copper and the majority appears to be of original construction.
• A four-inch Municipal water service supplies the property via an entry at the 1973 mechanical room on the south side of the building. There are no reported problems with the service entrance.
Age/Condition:
• The majority of the domestic water piping system is over thirty years old, has far exceeded its useful service life.
Code Issues:
• Not applicable.
Suitability for General Reuse:
• The domestic water piping is not suitable for reuse in an updated, modernized program of space use, and must be replaced.
• The Municipal Water Company should be consulted to determine suitability of overall property water service entrance for expansion of useful capacity.
3.2.4 Domestic Water Heaters
General:
• Two propane-fired water heaters with storage tank, located in the 1973 Boiler Room, serve plumbing fixtures in the 1973 Addition. Refer to Photograph C8 in Appendix “C”.
Age/Condition:
• The propane-fired water heaters are approximately eight years old and are in fair condition.
Code Issues:
• There are no apparent code issues related to the propane-fired water heaters.
Suitability for General Reuse:
• The water heaters are suitable for reuse, depending on capacity to serve an expanded program of space use. The need for additional capacity must be determined.
3.3 Fire Protection Systems and Equipment
3.3.1 Automatic Fire Suppression
General:
• There are no automatic fire suppression systems in the building. If substantial renovation is planned, a trade off cost study will be required to compare fire isolation affected by general construction barriers to full building fire sprinklering at $4.00 per square foot.
3.4 Electrical Systems and Equipment
3.4.1 Electric Service
General:
• Three-Phase underground 4160 VAC electric service conductors originate from PECO utility pole located next to Palmer Street. The service conductor conduits enter the building and into a 500 KVA unit substation with 120/208VAC secondary located off the old boiler room. Refer to Photograph C9 in Appendix “C”. The electric service is metered at the Utility Company Primary Distribution, “PD” rate.
Age/Condition:
• The original District owned, 1958 vintage Federal Pacific Main Dry Transformer failed within the past five years. Temporary emergency service expenses alone, including premium time, and a rental transformer over several months is reported to have cost more than $9,000.00. The permanent, new replacement is said to have cost more than
$30,000.00, again based on premium time, and tight space constraints in the electrical vault.
• Electrical service equipment, with the exception of the transformer which was just recently replaced, is more than thirty years old, in poor condition, and the manufacturer is no longer in business.
Code Issues:
• The transformer secondary is not protected by a main circuit breaker, as required by applicable life safety sections of the National Electric Code.
Suitability for General Reuse:
• The Electric service equipment (Federal Pacific) lost UL Certification in 1981, the existing equipment is unsafe for continued use, much less future use.
3.4.2 Service Entrance Switchboard
General:
• The switchboard’s six (6) air circuit breakers supply the entire building. These breakers (Federal Pacific) are no longer manufactured and the company is out of business. Refer to Photograph C10 in Appendix “C”.
Age/Condition:
• Electrical service switchboard is more than thirty years old and in poor condition, manufacturer is no longer in business and parts are unavailable.
Code Issues:
• The switchboard does not meet current life safety codes.
Suitability for General Reuse:
• Service entrance switchboard is not acceptable for present use, much less extended use for a new space program.
3.4.3 Branch Circuit Panelboards
General:
• Breaker circuit panels throughout the building supply lighting and general power circuits. There is a lack of available spaces for additional branch circuit breakers in these panels. Refer to Photograph C11 in Appendix “C” for a typical branch circuit panelboard.
Age/Condition:
• Branch circuit panelboards are more than thirty years old, and the manufacturer (Federal
Pacific) is no longer in business. Replacement circuit breakers are not available for these panels.
Code Issues:
• Not applicable.
Suitability for General Reuse:
• Panelboards throughout the building are not acceptable for present use, much less in a new space use program.
3.4.4 Interior Lighting Fixtures
General:
• Each classroom has three rows of stem mounted, two lamp T-12, fluorescent direct/ indirect light fixtures. Refer to Photograph C12 in Appendix “C” for typical classroom light fixtures. Corridor lighting is generally 2 x 4 lay-in with prismatic lens and T-12 lamps. Office lighting is 2 x 4 lay-in with ½" parabolic louvers and T-12 lamps.
Age/Condition:
• Fluorescent light fixtures throughout the building are between thirty and forty years old and are in fair condition, but are not energy efficient and contain “PCB” ballasts.
Code Issues:
• Not applicable.
Suitability for General Reuse:
• Interior light fixtures and exit signs, located throughout the building, are not suitable for reuse.
3.4.5 Emergency Lighting and Power Distribution
General:
• A diesel fueled 35Kw Onan Emergency generator and automatic transfer switch is located in the new boiler room and supplies power to life safety systems, emergency lighting, and one boiler and pump.
Age/Condition:
• The generator and transfer switch is less than two years old and in good condition.
Code Issues:
• There are no apparent code issues related to the generator and transfer switch.
Suitability for General Reuse:
• The generator and transfer switch are suitable for reuse.
3.4.6 Exterior Lighting Fixture
General:
• Pole mounted HID lighting fixtures are used in the parking lot using photocells for control. HID lights are mounted around perimeter of building for security lighting.
Age/Condition:
• Exterior HID light fixtures are in acceptable condition.
Code Issues:
• There are no apparent code issues related to the exterior lighting fixtures.
Suitability for General Reuse:
• Exterior Light fixtures are suitable for reuse.
3.4.7 Fire Alarm and Fire Detection System
General:
• The fire alarm system is a non-coded addressable system with pull stations and notification devices.
• Audio/visual alarm units are located in corridors and toilet rooms.
• Fire alarm control equipment is manufactured by Silent Night Company, and replacement parts are available. All alarms report to a central station. Refer to Photograph C13 in Appendix “C”. The Owner reports no problems with false alarms.
• Only a few smoke and heat detectors were observed.
Age/Condition:
• Fire alarm detection system equipment is less than two years old and in good condition.
Code Issues:
• Audio/Visual alarm units are not located in each classroom and office space, which fails to meet regulations of the Americans With Disabilities Act.
Suitability for General Reuse:
• Fire alarm and detection system equipment is suitable for reuse. The system must be expanded for addition of code required smoke detectors and audio/visual alarm units.
3.4.8 Public Address System
General:
• The Public Address (PA) and communication equipment was manufactured by Bogen Company, and includes: control panel in the administration office; speakers in all classrooms, corridors and offices; and handsets that provide intercommunication between classrooms and the main office.
Age/Condition:
• PA system equipment is approximately ten years old and in fair condition. Replacement parts are available for this system.
Code Issues:
• There are no apparent code issues related to the PA system.
Suitability for General Reuse:
• PA system equipment is suitable for reuse.
3.4.9 Computer Data Network System
General:
• Minimal data network outlets are located in each classroom. The data outlets are wired to a central data network patch panel. The data network system components are Category 5 rated.
Age/Condition:
• Data network system equipment is in good condition and is approximately seven years old. The data network file server equipment is approximately five years old.
Code Issues:
• There are no apparent code issues related to the data network system.
Suitability for General Reuse:
• Data network system equipment is suitable for continued use. Extensions will be required to suite the new program of use.
3.4.10 Clock and Change of Class Program System
General:
• Lathom Corporation manufactured the clock system. Replacement parts are available for this system. The clock control panel is located in the administration office and clocks are located in all classrooms. Refer to Photograph C14 in Appendix “C”.
Age/Condition:
• Clock control panel and all clocks are between five and ten years old and in good
condition.
Code Issues:
• There are no apparent code issues related to the clock system equipment.
Suitability for General Reuse:
• Clock system equipment is suitable for reuse and expansion.
3.4.11 Security and Intrusion Detection System
General:
• Building intrusion detection system equipment includes motion detectors in corridors and selected classrooms wired to control equipment in the first floor Small Group Instruction Room. Audio alarms are located on each floor in the corridor. Napco manufactured the motion detection system equipment and replacement parts are available.
Age/Condition:
• Intrusion detection system equipment is two to three years old and is in good condition.
Code Issues:
• There are no apparent code issues related to the intrusion detection system.
Suitability for General Reuse:
• Intrusion detection system equipment is suitable for reuse and expansion.
3.4.12 Auditorium Lighting and Dimming System
General:
• Lighting in the auditorium is recessed incandescent fixtures connected to the dimming system. Lighting level is generally poor and lamps are continually being replaced at significant expense.
• The dimming panel and remote control unit are forty years old, substantially inoperative, no longer in production, and parts are unavailable. The sound system is also of the same vintage. Both Sound and Stage Lighting Control Systems are not suitable for present use, much less extended use in an upgraded facility with modern space program.
• The stage lighting appears to be adequate, but the stage spotlights are forty years old and not energy efficient.
Age/Condition:
• The lighting and dimming system is approximately forty years old, and in poor condition.
Code Issues:
• There is insufficient working space around the dimming rack.
Suitability for General Reuse:
• The lighting and dimming system are not suitable for reuse.
3.4.13 Gymnasium Lighting
General:
• Lighting fixtures are twin hi-bay lighting fixtures with one mercury vapor lamp and one incandescent lamp on separate circuits.
• The mercury vapor lamp is inefficient compared to the newer HID light source.
Age/Condition:
• The lighting fixtures are approximately forty years old, and no longer made. Spare parts are not available.
Code Issues:
• Not applicable.
Suitability for General Reuse:
• The lighting system is not suitable for reuse.
We anxiously await the (drum roll please) VITETTA REPORT! Yes, the answer to all our problems, Vitetta will swoop in and tell us what to do.
Let's see if this report gets distributed.
UPDATED: The Vitetta Report is available at the district website.
3.0 Morrisville High School
Executive Summary
With the exception of the main sanitary, fire alarm, security, public address, data and clock systems, the mechanical and electrical systems have exceeded their expected service lives and require replacement. Depending on the new program, portions of the emergency lighting and electrical distribution systems can be retained.
3.1 Heating, Ventilating and Air Conditioning Systems and Equipment
3.1.1 Unit Ventilators and Air Handling Units
General:
• The majority of the classrooms, both in the original 1958 Building and the 1972 Addition are served by unit ventilators with hot water heating coils and ventilation air provisions. Ventilation is obtained both through the roof and through louvers on the exterior walls.
• Larger spaces, such as the gym, kitchen and the Instructional Materials Center are served by ducted air handling units with a hot water heating coil and outdoor air louvers.
Age/Condition:
• The unit ventilators, air handling units and ductwork are over thirty years old and have far exceeded their useful service lives.
Code Issues:
• Not applicable.
Suitability for General Reuse:
• The unit ventilators, air handling units and ductwork systems are not suitable for reuse and must be replaced.
3.1.2 Boilers
General:
• Two oil-fired boilers, which serve HVAC equipment in the original 1968 Building, generate heating water for classroom and corridor heating. Refer to Photograph C1 in Appendix “C”.
• Two oil-fired boilers, which were installed during the 1972 Addition, generate steam to serve heat exchangers. The heat exchangers use the boiler steam to provide heating water for the classrooms, corridors, and office spaces. Refer to Photograph C2 in Appendix “C”.
• Two base-mounted pumps circulate the heating water throughout the 1968 Building.
Refer to Photograph C3 in Appendix “C”.
Age/Condition:
• The boilers and heat exchangers are all over thirty years old and at the end of their useful service lives.
• The base-mounted pumps appear to be approximately five years old, in fair condition, and can be expected to last another ten to fifteen years.
Code Issues:
• There are not apparent code issues related to the base-mounted pumps.
Suitability for General Reuse:
• The boilers and heat exchangers, have exceeded their useful lives, are not suitable for reuse or continued use, and must be replaced.
• The pumps are not suited for new energy efficient HVAC systems required by a new program of space use, and must be replaced.
3.1.3 Cooling System
General:
• An existing air handling unit, which serves the Instructional Materials Center was retrofitted with a cooling coil and remote condensing unit in 1996. The dedicated condensing unit, rated for 30 tons cooling, is located in the open courtyard adjacent to the Instructional Materials Center.
• A 5-ton rooftop unit, installed in 1995, serves a conference room and the Business Manager’s Office Area.
• A 10-ton split system, installed in 1997, serves several offices on the west side of the open courtyard.
• Window air conditioners are incidental, have been added as piecemeal appliances at selective locations, and are not addressed further within this report.
Age/Condition:
• The existing air handling unit serving the Instructional Materials Center, as mentioned previously, is beyond it useful service life. Refer to Article 3.2.1 above.
• The 30-ton condensing unit, 5-ton rooftop unit and 10-ton split system are approximately ten years old and can be expected to last another five to eight years.
Code Issues:
• There are no apparent code issues related to the cooling system equipment.
Suitability for General Reuse:
• The 30-ton condensing unit, 5-ton rooftop unit and 10-ton split system, depending on the planned renovations and new program of space use at the existing unit locations, could be reused.
3.1.4 Underground Oil Tanks
General:
• There are two 12,000 gallon underground oil tanks, one located adjacent to each boiler room. Refer to Photograph C4 in Appendix “C”.
• Oil pumps, located at each boiler, supplies oil from the underground tank to the boilers.
Refer to Photograph C5 in Appendix “C”.
• A 5,000 gallon underground oil tank, which originally served an emergency generator, has been abandoned in-place.
Age/Condition:
• The oil tanks and pumps are over forty years old and have far exceeded their useful service lives.
Code Issues:
• Any repair work resulting from leaks will subject the overall system to compliance with stringent, expensive Federal Environmental Requirements. Prudent evaluation of existing tank/piping system integrity and lead free performance is recommended.
Suitability for General Reuse:
• The oil tanks and oil pumps are not suitable for reuse or continued use, and must be replaced.
3.1.5 Automatic Temperature Control System
General:
• Automatic temperature control system is pneumatic and served by multiple air compressors located in each Boiler Room.
Age/Condition:
• The control system appears to be over twenty years old and has far exceeded its useful service life.
Code Issues:
• Not applicable.
Suitability for General Reuse:
• The control system is not suitable for reuse or continued use, and must be replaced.
3.1.6 Exhaust Systems
General:
• General and toilet room exhaust is provided by roof mounted fans.
Age/Condition:
• The exhaust fans are over forty years old, have far exceeded their useful service lives, and are not meeting standard performance requirements.
Code Issues:
• Systems are unable to meet Pennsylvania State System Performance Requirements.
Suitability for General Reuse:
• The exhaust systems are not suitable for reuse and must be replaced.
3.2 Plumbing Systems and Equipment
3.2.1 Plumbing Fixtures
General:
• Plumbing fixtures consist of water closets, urinals, lavatories, showers, water coolers and hand sinks in various locations throughout the school. Refer to Photographs C6 and C7 in Appendix “C”.
Age/Condition:
• The majority of the plumbing fixtures appear to be at least thirty years old, have far exceeded their useful service lives, are in part faulty, and not capable of repair.
Code Issues:
• Systems are unable to meet Pennsylvania State System Performance Requirements.
Suitability for General Reuse:
• A majority of the plumbing fixtures are not suitable for continued use, much less reuse in an upgraded schoolhouse facility, and must be replaced.
3.2.2 Sanitary and Vent Piping
General:
• The piping is concealed in construction and was not directly observed. For the purposes of this report, it is assumed the piping is cast-iron and of original construction.
• There are no reported problems with the main building sewer.
Age/Condition:
• Sanitary and vent piping system is over thirty years old and has far exceeded its useful service life.
Code Issues:
• Not applicable.
Suitability for General Reuse:
• The domestic water piping is not suitable for reuse in an updated, modernized program of space use, and must be replaced.
• The Municipal Water Company should be consulted to determine suitability of overall property water service entrance for expansion of useful capacity.
3.2.3 Domestic Water Piping
General:
• The visible piping is copper and the majority appears to be of original construction.
• A four-inch Municipal water service supplies the property via an entry at the 1973 mechanical room on the south side of the building. There are no reported problems with the service entrance.
Age/Condition:
• The majority of the domestic water piping system is over thirty years old, has far exceeded its useful service life.
Code Issues:
• Not applicable.
Suitability for General Reuse:
• The domestic water piping is not suitable for reuse in an updated, modernized program of space use, and must be replaced.
• The Municipal Water Company should be consulted to determine suitability of overall property water service entrance for expansion of useful capacity.
3.2.4 Domestic Water Heaters
General:
• Two propane-fired water heaters with storage tank, located in the 1973 Boiler Room, serve plumbing fixtures in the 1973 Addition. Refer to Photograph C8 in Appendix “C”.
Age/Condition:
• The propane-fired water heaters are approximately eight years old and are in fair condition.
Code Issues:
• There are no apparent code issues related to the propane-fired water heaters.
Suitability for General Reuse:
• The water heaters are suitable for reuse, depending on capacity to serve an expanded program of space use. The need for additional capacity must be determined.
3.3 Fire Protection Systems and Equipment
3.3.1 Automatic Fire Suppression
General:
• There are no automatic fire suppression systems in the building. If substantial renovation is planned, a trade off cost study will be required to compare fire isolation affected by general construction barriers to full building fire sprinklering at $4.00 per square foot.
3.4 Electrical Systems and Equipment
3.4.1 Electric Service
General:
• Three-Phase underground 4160 VAC electric service conductors originate from PECO utility pole located next to Palmer Street. The service conductor conduits enter the building and into a 500 KVA unit substation with 120/208VAC secondary located off the old boiler room. Refer to Photograph C9 in Appendix “C”. The electric service is metered at the Utility Company Primary Distribution, “PD” rate.
Age/Condition:
• The original District owned, 1958 vintage Federal Pacific Main Dry Transformer failed within the past five years. Temporary emergency service expenses alone, including premium time, and a rental transformer over several months is reported to have cost more than $9,000.00. The permanent, new replacement is said to have cost more than
$30,000.00, again based on premium time, and tight space constraints in the electrical vault.
• Electrical service equipment, with the exception of the transformer which was just recently replaced, is more than thirty years old, in poor condition, and the manufacturer is no longer in business.
Code Issues:
• The transformer secondary is not protected by a main circuit breaker, as required by applicable life safety sections of the National Electric Code.
Suitability for General Reuse:
• The Electric service equipment (Federal Pacific) lost UL Certification in 1981, the existing equipment is unsafe for continued use, much less future use.
3.4.2 Service Entrance Switchboard
General:
• The switchboard’s six (6) air circuit breakers supply the entire building. These breakers (Federal Pacific) are no longer manufactured and the company is out of business. Refer to Photograph C10 in Appendix “C”.
Age/Condition:
• Electrical service switchboard is more than thirty years old and in poor condition, manufacturer is no longer in business and parts are unavailable.
Code Issues:
• The switchboard does not meet current life safety codes.
Suitability for General Reuse:
• Service entrance switchboard is not acceptable for present use, much less extended use for a new space program.
3.4.3 Branch Circuit Panelboards
General:
• Breaker circuit panels throughout the building supply lighting and general power circuits. There is a lack of available spaces for additional branch circuit breakers in these panels. Refer to Photograph C11 in Appendix “C” for a typical branch circuit panelboard.
Age/Condition:
• Branch circuit panelboards are more than thirty years old, and the manufacturer (Federal
Pacific) is no longer in business. Replacement circuit breakers are not available for these panels.
Code Issues:
• Not applicable.
Suitability for General Reuse:
• Panelboards throughout the building are not acceptable for present use, much less in a new space use program.
3.4.4 Interior Lighting Fixtures
General:
• Each classroom has three rows of stem mounted, two lamp T-12, fluorescent direct/ indirect light fixtures. Refer to Photograph C12 in Appendix “C” for typical classroom light fixtures. Corridor lighting is generally 2 x 4 lay-in with prismatic lens and T-12 lamps. Office lighting is 2 x 4 lay-in with ½" parabolic louvers and T-12 lamps.
Age/Condition:
• Fluorescent light fixtures throughout the building are between thirty and forty years old and are in fair condition, but are not energy efficient and contain “PCB” ballasts.
Code Issues:
• Not applicable.
Suitability for General Reuse:
• Interior light fixtures and exit signs, located throughout the building, are not suitable for reuse.
3.4.5 Emergency Lighting and Power Distribution
General:
• A diesel fueled 35Kw Onan Emergency generator and automatic transfer switch is located in the new boiler room and supplies power to life safety systems, emergency lighting, and one boiler and pump.
Age/Condition:
• The generator and transfer switch is less than two years old and in good condition.
Code Issues:
• There are no apparent code issues related to the generator and transfer switch.
Suitability for General Reuse:
• The generator and transfer switch are suitable for reuse.
3.4.6 Exterior Lighting Fixture
General:
• Pole mounted HID lighting fixtures are used in the parking lot using photocells for control. HID lights are mounted around perimeter of building for security lighting.
Age/Condition:
• Exterior HID light fixtures are in acceptable condition.
Code Issues:
• There are no apparent code issues related to the exterior lighting fixtures.
Suitability for General Reuse:
• Exterior Light fixtures are suitable for reuse.
3.4.7 Fire Alarm and Fire Detection System
General:
• The fire alarm system is a non-coded addressable system with pull stations and notification devices.
• Audio/visual alarm units are located in corridors and toilet rooms.
• Fire alarm control equipment is manufactured by Silent Night Company, and replacement parts are available. All alarms report to a central station. Refer to Photograph C13 in Appendix “C”. The Owner reports no problems with false alarms.
• Only a few smoke and heat detectors were observed.
Age/Condition:
• Fire alarm detection system equipment is less than two years old and in good condition.
Code Issues:
• Audio/Visual alarm units are not located in each classroom and office space, which fails to meet regulations of the Americans With Disabilities Act.
Suitability for General Reuse:
• Fire alarm and detection system equipment is suitable for reuse. The system must be expanded for addition of code required smoke detectors and audio/visual alarm units.
3.4.8 Public Address System
General:
• The Public Address (PA) and communication equipment was manufactured by Bogen Company, and includes: control panel in the administration office; speakers in all classrooms, corridors and offices; and handsets that provide intercommunication between classrooms and the main office.
Age/Condition:
• PA system equipment is approximately ten years old and in fair condition. Replacement parts are available for this system.
Code Issues:
• There are no apparent code issues related to the PA system.
Suitability for General Reuse:
• PA system equipment is suitable for reuse.
3.4.9 Computer Data Network System
General:
• Minimal data network outlets are located in each classroom. The data outlets are wired to a central data network patch panel. The data network system components are Category 5 rated.
Age/Condition:
• Data network system equipment is in good condition and is approximately seven years old. The data network file server equipment is approximately five years old.
Code Issues:
• There are no apparent code issues related to the data network system.
Suitability for General Reuse:
• Data network system equipment is suitable for continued use. Extensions will be required to suite the new program of use.
3.4.10 Clock and Change of Class Program System
General:
• Lathom Corporation manufactured the clock system. Replacement parts are available for this system. The clock control panel is located in the administration office and clocks are located in all classrooms. Refer to Photograph C14 in Appendix “C”.
Age/Condition:
• Clock control panel and all clocks are between five and ten years old and in good
condition.
Code Issues:
• There are no apparent code issues related to the clock system equipment.
Suitability for General Reuse:
• Clock system equipment is suitable for reuse and expansion.
3.4.11 Security and Intrusion Detection System
General:
• Building intrusion detection system equipment includes motion detectors in corridors and selected classrooms wired to control equipment in the first floor Small Group Instruction Room. Audio alarms are located on each floor in the corridor. Napco manufactured the motion detection system equipment and replacement parts are available.
Age/Condition:
• Intrusion detection system equipment is two to three years old and is in good condition.
Code Issues:
• There are no apparent code issues related to the intrusion detection system.
Suitability for General Reuse:
• Intrusion detection system equipment is suitable for reuse and expansion.
3.4.12 Auditorium Lighting and Dimming System
General:
• Lighting in the auditorium is recessed incandescent fixtures connected to the dimming system. Lighting level is generally poor and lamps are continually being replaced at significant expense.
• The dimming panel and remote control unit are forty years old, substantially inoperative, no longer in production, and parts are unavailable. The sound system is also of the same vintage. Both Sound and Stage Lighting Control Systems are not suitable for present use, much less extended use in an upgraded facility with modern space program.
• The stage lighting appears to be adequate, but the stage spotlights are forty years old and not energy efficient.
Age/Condition:
• The lighting and dimming system is approximately forty years old, and in poor condition.
Code Issues:
• There is insufficient working space around the dimming rack.
Suitability for General Reuse:
• The lighting and dimming system are not suitable for reuse.
3.4.13 Gymnasium Lighting
General:
• Lighting fixtures are twin hi-bay lighting fixtures with one mercury vapor lamp and one incandescent lamp on separate circuits.
• The mercury vapor lamp is inefficient compared to the newer HID light source.
Age/Condition:
• The lighting fixtures are approximately forty years old, and no longer made. Spare parts are not available.
Code Issues:
• Not applicable.
Suitability for General Reuse:
• The lighting system is not suitable for reuse.
Hellmann'$ Chri$tmas Pre$ent
From the BCCT.
Doe$ $crooge ever receive the the me$$age from the three gho$t$? Or were the dream$ $imply returned to $ender, addre$$ unknown?
The children of Morri$ville are only dollar $ign$ to the Emperor Pre$ident. They are $imply another commodity to be traded, bought, and $old.
The Emperor'$ opening $tatement recounting all the $aving$ he ha$ $upplied $howed much more that dollar$ and cent$ It $howed u$ an empty void. How $ad.
Voter$: We got what we paid for. Enjoy the $aving$.
Board plans hearing to close Reiter
Angry parents packed the meeting room to oppose the move. “Our community’s children are not numbers,” said one.
By MANASEE WAGH
After a 25-minute-late start and much heated finger-pointing, the Morrisville School Board voted Wednesday night to advertise for a public hearing to close M.R. Reiter Elementary School.
The hearing would be set for Wednesday, Jan. 14. Board members Robin Reithmeyer, Gloria Heater and Joseph Kemp voted against the advertisement. Board member Al Radosti was absent.
At least 150 residents packed the meeting room, many of them parents of elementary schoolchildren.
Prior to the vote, the board heard public comment from nearly 20 different borough residents, the majority of whom were angry and emotional about the move toward closing the school without determining where to place its more than 250 students safely.
“If these were your children, would you even consider this option?” elementary PTO President Robin Tohm asked the board.
She broke down in tears as she thanked the district staff and administrators for smoothly transitioning Reiter students to alternative locations temporarily after a late night explosion in Reiter’s furnace room blew out windows in the building on Dec. 13.
From Dec. 17 until at least Jan. 5, Reiter students are to attend class at alternative district locations, including the Morrisville YMCA, the Middle/Senior High School and Grandview Elementary School.
Parents expressed anger over board President William Hellmann’s statement at the start of the meeting outlining how much the current board is saving the borough in tax money through canceling last year’s planned construction of a new, $30 million consolidated school for all grades.
They were also upset about Hellmann’s recent e-mail exchanges with other board members in which he called the deteriorating Reiter a “rat trap” that is consuming borough funds for continued maintenance. Hellmann’s e-mail suggested putting all 400-plus elementary school students from Reiter and Grandview into the middle/senior high school.
“Our community’s children are not numbers,” said parent Damon Miller. “You can’t just shuffle them around.”
Putting all grades into the high school would be extremely difficult, since that building caters to older students’ needs, the administration has said.
In case students cannot return to Reiter during the rest of this school year because of safety concerns, they would be set up in modular units at Grandview, said Elizabeth Yonson, district superintendent. The estimated cost of those units could be $108,000, said administrators.
For an hour before the vote to hold a public hearing, board members argued loudly among themselves about what they did or did not do toward fixing the districts’ three schools this past year. Shouts and comments against the board majority and applause for those who spoke against the board president punctuated their arguments.
Board member Gloria Heater accused Hellmann of trying to get some board members to come to a vote about the future of the schools behind other board members’ backs.
At that, some residents yelled at Hellmann, “Resign now!”
A representative from Vitetta, the engineering and architectural firm the school board hired to analyze district schools, also spoke at the meeting to say that his firm had released its report today about the state of the two elementary schools’ boilers, electrical systems, windows and ventilators. The report includes estimations for renovation costs.
It will be posted on the district Web site at www.mv.org.
The board has to hold a public hearing at least 90 days before making any decision to close a school, according to school code.
Doe$ $crooge ever receive the the me$$age from the three gho$t$? Or were the dream$ $imply returned to $ender, addre$$ unknown?
The children of Morri$ville are only dollar $ign$ to the Emperor Pre$ident. They are $imply another commodity to be traded, bought, and $old.
The Emperor'$ opening $tatement recounting all the $aving$ he ha$ $upplied $howed much more that dollar$ and cent$ It $howed u$ an empty void. How $ad.
Voter$: We got what we paid for. Enjoy the $aving$.
Board plans hearing to close Reiter
Angry parents packed the meeting room to oppose the move. “Our community’s children are not numbers,” said one.
By MANASEE WAGH
After a 25-minute-late start and much heated finger-pointing, the Morrisville School Board voted Wednesday night to advertise for a public hearing to close M.R. Reiter Elementary School.
The hearing would be set for Wednesday, Jan. 14. Board members Robin Reithmeyer, Gloria Heater and Joseph Kemp voted against the advertisement. Board member Al Radosti was absent.
At least 150 residents packed the meeting room, many of them parents of elementary schoolchildren.
Prior to the vote, the board heard public comment from nearly 20 different borough residents, the majority of whom were angry and emotional about the move toward closing the school without determining where to place its more than 250 students safely.
“If these were your children, would you even consider this option?” elementary PTO President Robin Tohm asked the board.
She broke down in tears as she thanked the district staff and administrators for smoothly transitioning Reiter students to alternative locations temporarily after a late night explosion in Reiter’s furnace room blew out windows in the building on Dec. 13.
From Dec. 17 until at least Jan. 5, Reiter students are to attend class at alternative district locations, including the Morrisville YMCA, the Middle/Senior High School and Grandview Elementary School.
Parents expressed anger over board President William Hellmann’s statement at the start of the meeting outlining how much the current board is saving the borough in tax money through canceling last year’s planned construction of a new, $30 million consolidated school for all grades.
They were also upset about Hellmann’s recent e-mail exchanges with other board members in which he called the deteriorating Reiter a “rat trap” that is consuming borough funds for continued maintenance. Hellmann’s e-mail suggested putting all 400-plus elementary school students from Reiter and Grandview into the middle/senior high school.
“Our community’s children are not numbers,” said parent Damon Miller. “You can’t just shuffle them around.”
Putting all grades into the high school would be extremely difficult, since that building caters to older students’ needs, the administration has said.
In case students cannot return to Reiter during the rest of this school year because of safety concerns, they would be set up in modular units at Grandview, said Elizabeth Yonson, district superintendent. The estimated cost of those units could be $108,000, said administrators.
For an hour before the vote to hold a public hearing, board members argued loudly among themselves about what they did or did not do toward fixing the districts’ three schools this past year. Shouts and comments against the board majority and applause for those who spoke against the board president punctuated their arguments.
Board member Gloria Heater accused Hellmann of trying to get some board members to come to a vote about the future of the schools behind other board members’ backs.
At that, some residents yelled at Hellmann, “Resign now!”
A representative from Vitetta, the engineering and architectural firm the school board hired to analyze district schools, also spoke at the meeting to say that his firm had released its report today about the state of the two elementary schools’ boilers, electrical systems, windows and ventilators. The report includes estimations for renovation costs.
It will be posted on the district Web site at www.mv.org.
The board has to hold a public hearing at least 90 days before making any decision to close a school, according to school code.
Labels:
Grandview,
Hellmann,
Morrisville PTO,
Radosti,
Reiter,
Reiter shut down,
trailers,
Vitetta,
Yonson
Wednesday, December 17, 2008
Moving students angers some parents
From the BCCT.
Moving students angers some parents
Reiter Elementary remains closed. Students are attending classes at three different sites, and that has parents concerned.
By MANASEE WAGH
M.R. Reiter Elementary School students have been uprooted from their classrooms.
And parents are angry.
A furnace explosion Saturday is keeping Reiter closed until at least Jan. 5. More than 250 students will have temporary classes in the middle/high school, the Morrisville YMCA and Grandview Elementary School. Nobody was hurt in the explosion, but the school remains closed while the borough and the district insurance company investigate the cause.
On Tuesday, district officials met with a large crowd of parents in the Morrisville Middle/High School gym to show them where their kids will learn for the next several days. Teachers took parents on tours of classrooms and spaces where their first- and second-graders will restart today. The young students will stay with teachers and aides at all times without mixing with higher grades, said administrators.
Families had many questions and complaints. They said they wished the school board, which has been in office a year, had fixed known facilities problems earlier.
“This is a nightmare,” said Tammi Bresen, the mother of a first-grader at Reiter. She didn’t like that three first-grade classes had to learn in makeshift classrooms in the library, with only a partial wall separating them.
“People aren’t happy, especially because the (furnace) was already having problems before,” said Jim Mahler, the father of a Reiter child. He said the board should fix the furnace immediately.
Oil odors began the afternoon of Dec. 10 in Reiter and then resumed Thursday morning, forcing students to leave while the district had a fuel pump replaced by an outside company. Later the furnace exploded, breaking a window in the boiler room.
One probable reason for the explosion is that the fuel valve to turn the fuel flow on and off got stuck in the open position, allowing fuel to continue pumping even after the burner shut off, said Tim Lastichen, the district’s director of facilities.
The district’s insurance company will likely pay for cleanup and repairs, said Elizabeth Yonson, district superintendent, Tuesday.
Built in the 1920’s, Reiter is older and in worse shape than Grandview, even without counting the boiler explosion, Lastichen said. Vitetta, the engineering and architectural firm the school board hired to analyze district schools, will probably report higher renovation costs for Reiter, he added.
William Hellmann, the school board president, said he expects the completed Vitetta report this week.
Some parents questioned whether Reiter would be closed permanently. Tonight, the board plans to discuss having a public hearing to close one of its two elementary schools. If the county buys the land as preserved open space, said Hellmann, the remaining two schools would benefit from the money. It could be used for renovation, he said.
However, Nancy Sherlock, president of the borough council, said Tuesday that she doesn’t think the borough would buy the land. Nor would the borough plan to prevent the district from reopening Reiter, as current rumors of an injunction suggest.
“An injunction means usurping power. We aren’t doing that,” she said, adding, “I don’t think the borough needs any more open space. I can’t speak for other council members.”
Hellmann said he would be amenable to a single school building for all students, “if we could work it out that way, but I’m not sure the town wants a kindergarten through 12thgrade school. We’d always have to have at least one elementary school,” he said.
“I am not averse to spending money on the school district as long as the money is spent efficiently. I don’t have specific examples of how right now,” continued Hellmann.
One thing sticks in Hellmann’s mind: three buildings for less than 900 children are too many, he said.
“To me it’s just common sense,” he said.
Trying to integrate hundreds of additional students into the high school would be a logistical nightmare, especially without constructing new building additions to make sure upper and lower grades don’t mix, administration officials said. Different hallways in the high school have dedicated spaces like computer labs, science labs and the woodshop. Right now, the cafeteria and library cater to upper grades only.
If a public hearing to sell a building takes place, the school board would have to wait 90 days before making the decision to sell it or not, according to school code.
Robin Tohm, the elementary schools’ PTO president, urged parents to attend tonight’s school board meeting and make their voices heard.
Yonson told parents at Tuesday’s open house that she would not send students back to Reiter unless air quality experts and cleanup crews say the school is safe.
“Everyone has been wonderful and pitching in to make things as easy as possible to manage for the next (several) days. I’m very grateful for the flexibility of the staff,” Yonson said. “I’m very hopeful we will be able to get kids back to Reiter. But it’s up to the board,” she added.
Moving students angers some parents
Reiter Elementary remains closed. Students are attending classes at three different sites, and that has parents concerned.
By MANASEE WAGH
M.R. Reiter Elementary School students have been uprooted from their classrooms.
And parents are angry.
A furnace explosion Saturday is keeping Reiter closed until at least Jan. 5. More than 250 students will have temporary classes in the middle/high school, the Morrisville YMCA and Grandview Elementary School. Nobody was hurt in the explosion, but the school remains closed while the borough and the district insurance company investigate the cause.
On Tuesday, district officials met with a large crowd of parents in the Morrisville Middle/High School gym to show them where their kids will learn for the next several days. Teachers took parents on tours of classrooms and spaces where their first- and second-graders will restart today. The young students will stay with teachers and aides at all times without mixing with higher grades, said administrators.
Families had many questions and complaints. They said they wished the school board, which has been in office a year, had fixed known facilities problems earlier.
“This is a nightmare,” said Tammi Bresen, the mother of a first-grader at Reiter. She didn’t like that three first-grade classes had to learn in makeshift classrooms in the library, with only a partial wall separating them.
“People aren’t happy, especially because the (furnace) was already having problems before,” said Jim Mahler, the father of a Reiter child. He said the board should fix the furnace immediately.
Oil odors began the afternoon of Dec. 10 in Reiter and then resumed Thursday morning, forcing students to leave while the district had a fuel pump replaced by an outside company. Later the furnace exploded, breaking a window in the boiler room.
One probable reason for the explosion is that the fuel valve to turn the fuel flow on and off got stuck in the open position, allowing fuel to continue pumping even after the burner shut off, said Tim Lastichen, the district’s director of facilities.
The district’s insurance company will likely pay for cleanup and repairs, said Elizabeth Yonson, district superintendent, Tuesday.
Built in the 1920’s, Reiter is older and in worse shape than Grandview, even without counting the boiler explosion, Lastichen said. Vitetta, the engineering and architectural firm the school board hired to analyze district schools, will probably report higher renovation costs for Reiter, he added.
William Hellmann, the school board president, said he expects the completed Vitetta report this week.
Some parents questioned whether Reiter would be closed permanently. Tonight, the board plans to discuss having a public hearing to close one of its two elementary schools. If the county buys the land as preserved open space, said Hellmann, the remaining two schools would benefit from the money. It could be used for renovation, he said.
However, Nancy Sherlock, president of the borough council, said Tuesday that she doesn’t think the borough would buy the land. Nor would the borough plan to prevent the district from reopening Reiter, as current rumors of an injunction suggest.
“An injunction means usurping power. We aren’t doing that,” she said, adding, “I don’t think the borough needs any more open space. I can’t speak for other council members.”
Hellmann said he would be amenable to a single school building for all students, “if we could work it out that way, but I’m not sure the town wants a kindergarten through 12thgrade school. We’d always have to have at least one elementary school,” he said.
“I am not averse to spending money on the school district as long as the money is spent efficiently. I don’t have specific examples of how right now,” continued Hellmann.
One thing sticks in Hellmann’s mind: three buildings for less than 900 children are too many, he said.
“To me it’s just common sense,” he said.
Trying to integrate hundreds of additional students into the high school would be a logistical nightmare, especially without constructing new building additions to make sure upper and lower grades don’t mix, administration officials said. Different hallways in the high school have dedicated spaces like computer labs, science labs and the woodshop. Right now, the cafeteria and library cater to upper grades only.
If a public hearing to sell a building takes place, the school board would have to wait 90 days before making the decision to sell it or not, according to school code.
Robin Tohm, the elementary schools’ PTO president, urged parents to attend tonight’s school board meeting and make their voices heard.
Yonson told parents at Tuesday’s open house that she would not send students back to Reiter unless air quality experts and cleanup crews say the school is safe.
“Everyone has been wonderful and pitching in to make things as easy as possible to manage for the next (several) days. I’m very grateful for the flexibility of the staff,” Yonson said. “I’m very hopeful we will be able to get kids back to Reiter. But it’s up to the board,” she added.
Labels:
Hellmann,
Morrisville PTO,
Reiter,
Vitetta,
Yonson
Sunday, December 14, 2008
Reiter Air Quality Testing Monday Morning
From the BCCT.
How early in the morning is this testing on Monday? Before or after the students arrive?
What was wrong with testing on Saturday or Sunday so that if a cancellation of classes on Monday was needed, there was time to fix the problem to allow for Monday classes or to effectively plan a shutdown.
Oops. Sorry. I used that word again...PLAN!
Students to return to school after inspection
An air quality inspection will be conducted early Monday morning to look for any harmful air particles before allowing students to re-enter M.R. Reiter Elementary School on Monday.
The school was closed for a day and a half after a faulty fuel pump in an old boiler caused oily fumes throughout the building.
While there was no danger to students or staff, the odor was very unpleasant, said Superintendent Elizabeth Yonson. She ordered the school to be evacuated Wednesday afternoon when the odor first started. Despite a temporary fix, school was closed early Thursday when the odor reappeared.
It remained closed Friday while a new fuel pump was installed and the building was aired out, said Tim Lastichen, the district’s director of facilities.
“The inspection is an extra precaution to let the teachers and parents know we’re doing all we can,” he said.
School board members are waiting for engineering and architectural firm Vitetta to deliver a detailed engineering report about needed renovations in the district’s two elementary schools.
How early in the morning is this testing on Monday? Before or after the students arrive?
What was wrong with testing on Saturday or Sunday so that if a cancellation of classes on Monday was needed, there was time to fix the problem to allow for Monday classes or to effectively plan a shutdown.
Oops. Sorry. I used that word again...PLAN!
Students to return to school after inspection
An air quality inspection will be conducted early Monday morning to look for any harmful air particles before allowing students to re-enter M.R. Reiter Elementary School on Monday.
The school was closed for a day and a half after a faulty fuel pump in an old boiler caused oily fumes throughout the building.
While there was no danger to students or staff, the odor was very unpleasant, said Superintendent Elizabeth Yonson. She ordered the school to be evacuated Wednesday afternoon when the odor first started. Despite a temporary fix, school was closed early Thursday when the odor reappeared.
It remained closed Friday while a new fuel pump was installed and the building was aired out, said Tim Lastichen, the district’s director of facilities.
“The inspection is an extra precaution to let the teachers and parents know we’re doing all we can,” he said.
School board members are waiting for engineering and architectural firm Vitetta to deliver a detailed engineering report about needed renovations in the district’s two elementary schools.
Friday, December 12, 2008
President considers closing school
From the BCCT.
President considers closing school
By MANASEE WAGH
The president of the Morrisville school board is thinking about closing an elementary school and wants to hold a public hearing on the idea.
The district will save money by closing either M. R. Reiter Elementary or Grandview Elementary, Bill Hellmann said. He contends Morrisville doesn’t need three school buildings for about 870 students.
“I am not sure at this time what the school board will do with the school building that is closed, if that is what the board decides. We do have a budget crisis and closing one of the schools will make us much more efficient. I also do not believe the educational quality will suffer as the result of closing one of the buildings,” Hellmann wrote in an e-mail.
“If any building or land is sold, the funds would be put in the capital reserve fund for future renovations, if needed. Of course, the entire board would have to make this choice,” he wrote.
Rumors have been circulating about the board closing one elementary school, but Wednesday’s board meeting was the first time many board members heard of concrete steps being taken toward closing a building.
“It seems premature. We should have discussed it and decided which one and then started the process. How are we going to have a hearing and how are we going to answer the public’s questions?” said board member Robin Reithmeyer.
Both the elementary buildings and the middle/high school need frequent fixes. A mechanical malfunction in a boiler caused an oily odor throughout Reiter and sent kids home Thursday morning.
“This problem goes back years and years,” said board member Marlys Mihok, blaming the previous board for not putting money into renovations.
The former school board wanted to build a new $30 million consolidated building for grades pre-kindergarten through 12. Morrisville residents’ opinions clashed on that decision. A majority voted in several new board members who stopped the new construction and returned much of the money borrowed for that project.
The board awaits a final report about the state of the elementary schools by Vitetta, an architectural and engineering firm. It will aid in deciding which school, if any, can be closed, said Mihok.
“Does this mean that, now that we have no money, we can fix up the schools? We are living on borrowed time,” said Johanny Manning, a school district parent and a former board member who wanted to build the new school.
In October, the district Citizens Action Plan Committee made several suggestions, including asking the board to create a master renovation plan. Borough residents and some representatives from the school board and administration are part of the group.
Member Damon Miller, a district parent, said the committee never recommended closing a school.
According to school code, the board needs to advertise for a public hearing to discuss a closing. Board members need to wait 90 days after that meeting to make a decision. If a school is closed, the entire process would probably take about four to five months, said district solicitor Michael Fitzpatrick.
President considers closing school
By MANASEE WAGH
The president of the Morrisville school board is thinking about closing an elementary school and wants to hold a public hearing on the idea.
The district will save money by closing either M. R. Reiter Elementary or Grandview Elementary, Bill Hellmann said. He contends Morrisville doesn’t need three school buildings for about 870 students.
“I am not sure at this time what the school board will do with the school building that is closed, if that is what the board decides. We do have a budget crisis and closing one of the schools will make us much more efficient. I also do not believe the educational quality will suffer as the result of closing one of the buildings,” Hellmann wrote in an e-mail.
“If any building or land is sold, the funds would be put in the capital reserve fund for future renovations, if needed. Of course, the entire board would have to make this choice,” he wrote.
Rumors have been circulating about the board closing one elementary school, but Wednesday’s board meeting was the first time many board members heard of concrete steps being taken toward closing a building.
“It seems premature. We should have discussed it and decided which one and then started the process. How are we going to have a hearing and how are we going to answer the public’s questions?” said board member Robin Reithmeyer.
Both the elementary buildings and the middle/high school need frequent fixes. A mechanical malfunction in a boiler caused an oily odor throughout Reiter and sent kids home Thursday morning.
“This problem goes back years and years,” said board member Marlys Mihok, blaming the previous board for not putting money into renovations.
The former school board wanted to build a new $30 million consolidated building for grades pre-kindergarten through 12. Morrisville residents’ opinions clashed on that decision. A majority voted in several new board members who stopped the new construction and returned much of the money borrowed for that project.
The board awaits a final report about the state of the elementary schools by Vitetta, an architectural and engineering firm. It will aid in deciding which school, if any, can be closed, said Mihok.
“Does this mean that, now that we have no money, we can fix up the schools? We are living on borrowed time,” said Johanny Manning, a school district parent and a former board member who wanted to build the new school.
In October, the district Citizens Action Plan Committee made several suggestions, including asking the board to create a master renovation plan. Borough residents and some representatives from the school board and administration are part of the group.
Member Damon Miller, a district parent, said the committee never recommended closing a school.
According to school code, the board needs to advertise for a public hearing to discuss a closing. Board members need to wait 90 days after that meeting to make a decision. If a school is closed, the entire process would probably take about four to five months, said district solicitor Michael Fitzpatrick.
Monday, November 10, 2008
But Where's the PLAN??
From the BCCT.
And so the renovations begin. The overarching renovations plan is STILL missing in action. It looks like we're going to piecemeal ourselves to death on uncoordinated fits of renovation spending.
The board members who make the political decisions won't comment on the record, so they send out Tim Lastician to take the slings and arrows instead. We're not sure when the renovations will be done...We hope it will be half done before September 2009.
This is all very reassuring...NOT! What will we do when the "Welcome Back, Students!" signs next September are accompanied by "Caution: Construction Zone" signs?
Channeling the departed Ed Frankenfield for a moment, we've been waiting, and waiting, and waiting for a plan. The plan is probably out there, shrouded in secrecy and known but to only a few of the Emperor's most dedicated Kool-Aid cronies.
Why don't we want to upgrade our schools and welcome those with disabilities? Isn't it ironic that many of those taxpayers who most oppose making the schools a little more user friendly are among those who hobble most desperately up the steps to attend board meetings.
Paging Clara Peller: Where's the plan?
LOL: I don't think there's anyone back there, either.
Renovation plans moving forward
The parts and labor for the long-anticipated renovations are estimated to cost about $3.7 million plus another $400,000 in contract fees.
By MANASEE WAGH
Renovation plans at the 50-year-old Morrisville high school are swinging into gear.
The recent decision has come after years of wavering among previous and current board members about what to do with the district’s high school and two elementary schools.
Morrisville’s school board is working with Vitetta, a Philadelphia-based architectural and engineering corporation, to update old heating, ventilating and air-conditioning systems at the Middle/Senior High School.
The project’s scope includes a range of new components, including ventilators for heating in classrooms, windows with better weatherproofing, expansion tanks for boilers, heating and ventilation units in the gym, locker rooms, auditorium and kitchen, gas-fired hot water heaters and parts for the air- conditioning units in the library and administrative offices.
Vitetta also will test the hot water supply and piping at the high school because it probably has corroded due to age, said the facilities manager, Tim Lastichen.
There have been no sizeable renovations to any of the district’s three schools in decades, Lastichen said.
Morrisville’s two elementary schools are also in need of similar repairs, and the school board is in talks with Vitetta to perform upgrades there.
Morrisville residents have been calling for a plan to improve the deteriorating school buildings since the current board canceled plans to build a consolidated K-12 school early this year.
Part of the original $30 million bond meant for the new school will be used instead for the renovations.
The company’s fees for overseeing the high school upgrades total about $400,000, and the cost of replacement parts and labor is expected to be around $3.7 million.
At the previous school board meeting, board member Robin Reithmeyer voted against the initiative to pursue these renovations because the district isn’t applying for state reimbursement.
Under certain circumstances, the state Department of Education can refund a school district a portion of construction project costs if the district follows the department’s approval process, called PlanCon.
Vitetta architects found the project does not meet state guidelines necessary for PlanCon approvals, said William Hellmann, board president.
Either renovation or construction is eligible for state reimbursement only under two criteria, according to the state Department of Education: adding capacity to the building, as in the case of a growing student population, or bringing the building up to modern American Disabilities Act standards.
Therefore, Morrisville’s renovations wouldn’t be eligible, according to the state.
“Believe me, if I could get money from the state, I would be the first to do it,” Hellmann said. “This work is for the health, safety and welfare of the children and teachers and needs to be done as soon as possible.”
Though a concrete timeline for completing the upgrades is not available yet, the district plans to dive in as soon as the school year is over in June. Hopefully, the work will be at least half finished before the summer ends, Lastichen said.
Originally built in 1925, the district’s two elementary schools, Grandview and M. R. Reiter, are much older than the high school.
Grandview’s front section was added to the original building in 1957 and its back section was added in 1968. Reiter needed to be renovated in the 1960s after catching fire.
“But nothing’s been touched since,” Lastichen said. “So it needs it.”
And so the renovations begin. The overarching renovations plan is STILL missing in action. It looks like we're going to piecemeal ourselves to death on uncoordinated fits of renovation spending.
The board members who make the political decisions won't comment on the record, so they send out Tim Lastician to take the slings and arrows instead. We're not sure when the renovations will be done...We hope it will be half done before September 2009.
This is all very reassuring...NOT! What will we do when the "Welcome Back, Students!" signs next September are accompanied by "Caution: Construction Zone" signs?
Channeling the departed Ed Frankenfield for a moment, we've been waiting, and waiting, and waiting for a plan. The plan is probably out there, shrouded in secrecy and known but to only a few of the Emperor's most dedicated Kool-Aid cronies.
Why don't we want to upgrade our schools and welcome those with disabilities? Isn't it ironic that many of those taxpayers who most oppose making the schools a little more user friendly are among those who hobble most desperately up the steps to attend board meetings.
Paging Clara Peller: Where's the plan?
LOL: I don't think there's anyone back there, either.
Renovation plans moving forward
The parts and labor for the long-anticipated renovations are estimated to cost about $3.7 million plus another $400,000 in contract fees.
By MANASEE WAGH
Renovation plans at the 50-year-old Morrisville high school are swinging into gear.
The recent decision has come after years of wavering among previous and current board members about what to do with the district’s high school and two elementary schools.
Morrisville’s school board is working with Vitetta, a Philadelphia-based architectural and engineering corporation, to update old heating, ventilating and air-conditioning systems at the Middle/Senior High School.
The project’s scope includes a range of new components, including ventilators for heating in classrooms, windows with better weatherproofing, expansion tanks for boilers, heating and ventilation units in the gym, locker rooms, auditorium and kitchen, gas-fired hot water heaters and parts for the air- conditioning units in the library and administrative offices.
Vitetta also will test the hot water supply and piping at the high school because it probably has corroded due to age, said the facilities manager, Tim Lastichen.
There have been no sizeable renovations to any of the district’s three schools in decades, Lastichen said.
Morrisville’s two elementary schools are also in need of similar repairs, and the school board is in talks with Vitetta to perform upgrades there.
Morrisville residents have been calling for a plan to improve the deteriorating school buildings since the current board canceled plans to build a consolidated K-12 school early this year.
Part of the original $30 million bond meant for the new school will be used instead for the renovations.
The company’s fees for overseeing the high school upgrades total about $400,000, and the cost of replacement parts and labor is expected to be around $3.7 million.
At the previous school board meeting, board member Robin Reithmeyer voted against the initiative to pursue these renovations because the district isn’t applying for state reimbursement.
Under certain circumstances, the state Department of Education can refund a school district a portion of construction project costs if the district follows the department’s approval process, called PlanCon.
Vitetta architects found the project does not meet state guidelines necessary for PlanCon approvals, said William Hellmann, board president.
Either renovation or construction is eligible for state reimbursement only under two criteria, according to the state Department of Education: adding capacity to the building, as in the case of a growing student population, or bringing the building up to modern American Disabilities Act standards.
Therefore, Morrisville’s renovations wouldn’t be eligible, according to the state.
“Believe me, if I could get money from the state, I would be the first to do it,” Hellmann said. “This work is for the health, safety and welfare of the children and teachers and needs to be done as soon as possible.”
Though a concrete timeline for completing the upgrades is not available yet, the district plans to dive in as soon as the school year is over in June. Hopefully, the work will be at least half finished before the summer ends, Lastichen said.
Originally built in 1925, the district’s two elementary schools, Grandview and M. R. Reiter, are much older than the high school.
Grandview’s front section was added to the original building in 1957 and its back section was added in 1968. Reiter needed to be renovated in the 1960s after catching fire.
“But nothing’s been touched since,” Lastichen said. “So it needs it.”
Labels:
Frankenfield,
Frankenfield Question,
Hellmann,
Lastician,
renovation,
Vitetta
Friday, November 7, 2008
We Don't Need No Stinkin' State Money
From the BCCT.
You just have to shake your head and ask "Why?" when you see this line: "The project does not meet state guidelines necessary for state PlanCon reimbursement."
How is this a wise use of the taxpayer money of Morrisville?
Renovation plans at the 50-year-old Morrisville high school
Posted in News on Thursday, November 6th, 2008 at 6:31 pm by Courier Times reporter Manasee Wagh
Morrisville’s school board is working with Vitetta, a Philadelphia-based architectural and engineering corporation, to update old heating, ventilating and air-conditioning systems at the Middle/Senior High School.The project’s scope includes a range of new components, including ventilators for heating in classrooms, windows with better weatherproofing, expansion tanks for boilers, heating and ventilation units in the gym, locker rooms, auditorium and kitchen, gas-fired hot water heaters and parts for the air- conditioning units in the library and administrative offices.
Vitetta also will test the hot water supply and piping at the high school because it probably has corroded due to age, said the facilities manager, Tim Lastichen.
There have been no sizeable renovations to any of the district’s three schools in decades, Lastichen said.
Morrisville’s two elementary schools are also in need of similar repairs, and the school board is in talks with Vitetta to perform upgrades there.
Part of the original $30 million bond meant for the new school will be used instead for the renovations.
The company’s fees for overseeing the high school upgrades total about $400,000, and the cost of replacement parts and labor is expected to be around $3.7 million.
The project does not meet state guidelines necessary for state PlanCon reimbursement.
Either renovation or construction is eligible for state reimbursement only under two criteria, according to the state Department of Education: adding capacity to the building, as in the case of a growing student population, or bringing the building up to modern American Disabilities Act standards.
You just have to shake your head and ask "Why?" when you see this line: "The project does not meet state guidelines necessary for state PlanCon reimbursement."
How is this a wise use of the taxpayer money of Morrisville?
Renovation plans at the 50-year-old Morrisville high school
Posted in News on Thursday, November 6th, 2008 at 6:31 pm by Courier Times reporter Manasee Wagh
Morrisville’s school board is working with Vitetta, a Philadelphia-based architectural and engineering corporation, to update old heating, ventilating and air-conditioning systems at the Middle/Senior High School.The project’s scope includes a range of new components, including ventilators for heating in classrooms, windows with better weatherproofing, expansion tanks for boilers, heating and ventilation units in the gym, locker rooms, auditorium and kitchen, gas-fired hot water heaters and parts for the air- conditioning units in the library and administrative offices.
Vitetta also will test the hot water supply and piping at the high school because it probably has corroded due to age, said the facilities manager, Tim Lastichen.
There have been no sizeable renovations to any of the district’s three schools in decades, Lastichen said.
Morrisville’s two elementary schools are also in need of similar repairs, and the school board is in talks with Vitetta to perform upgrades there.
Part of the original $30 million bond meant for the new school will be used instead for the renovations.
The company’s fees for overseeing the high school upgrades total about $400,000, and the cost of replacement parts and labor is expected to be around $3.7 million.
The project does not meet state guidelines necessary for state PlanCon reimbursement.
Either renovation or construction is eligible for state reimbursement only under two criteria, according to the state Department of Education: adding capacity to the building, as in the case of a growing student population, or bringing the building up to modern American Disabilities Act standards.
Friday, September 26, 2008
New school nearing completion
From the BCCT. Congrats to the Bristol School District.
New school nearing completion
Bristol’s new school is roughly 70 percent complete, according to the architect who designed the facility.
“We’re making very good progress with all of our prime [contractors],” said Michael Minton, a VITETTA architect, during the district’s school board meeting Thursday night.
The estimated $33.2 million school will house Bristol’s prekindergarten through eighth grade classes. It will be able to accommodate up to 1,100 students.
The building is located off Buckley Street adjacent to the current Warren Snyder-John Girotti Elementary School.
It originally was supposed to be completed in time for the beginning of the current school year, but was delayed for four months early on in the project while urban fill was removed from the site.
The building likely will be completed in early 2009, school district officials said.
New school nearing completion
Bristol’s new school is roughly 70 percent complete, according to the architect who designed the facility.
“We’re making very good progress with all of our prime [contractors],” said Michael Minton, a VITETTA architect, during the district’s school board meeting Thursday night.
The estimated $33.2 million school will house Bristol’s prekindergarten through eighth grade classes. It will be able to accommodate up to 1,100 students.
The building is located off Buckley Street adjacent to the current Warren Snyder-John Girotti Elementary School.
It originally was supposed to be completed in time for the beginning of the current school year, but was delayed for four months early on in the project while urban fill was removed from the site.
The building likely will be completed in early 2009, school district officials said.
Labels:
Bristol,
renovation in other districts,
Vitetta
Saturday, July 19, 2008
Special Meeting Recap
From the BCCT
District takes steps toward restoring schools
By MANASEE WAGH
After several decades, it’s time to initiate serious updates in Morrisville schools, say area residents.
The school board recently voted 7-1 to start preliminary work to replace the boilers in the high school building and Grandview Elementary.
Some school board members and residents call it the first step toward restoring the schools, which have been in need of repairs for years.
“This is the beginning of something. People should applaud this beginning,” said resident Sharon Hughes.
The district will use Vitetta, a Philadelphia-based architectural and engineering corporation, to begin assessing the work necessary to replace the boilers, as well as looking into two new burners for the elementary school.
Morrisville residents have been calling for a plan to get the deteriorating high school and both elementaries in better shape since the current board canceled plans to build a consolidated K-12 school.
But there’s a problem with taking action on the boilers now, the board minority said.
Evaluating the needs of two schools, designing a custom boiler for each and completing installation could take six months. That would put the project’s conclusion well into the heating season, according to Tim Lastichen, district facilities director.
The price tag for the boilers alone is more than $100,000, not counting the labor and any expenses that could crop up along the way, he said at the Tuesday board meeting.
Some residents and the board minority complained this is a poor time to start an expensive project without a long-term restoration plan that would take the schools’ many other problems into account.
In May, the board voted to hire Wick Fisher White, an engineering firm, to do a $30,000 study of the work needed at the high school and two elementaries. The next step was to advertise for several companies to do that work.
On June, 12 companies submitted proposals to work on all three school buildings. Bill Hellmann, the board president, later cut that down to five and removed M. R. Reiter from the equation without consulting the rest of the board, said board member Robin Reithmeyer at Tuesday’s board meeting.
She voted against going forward on the boiler replacements without a plan that included all three schools.
However, some board members and residents attending the meeting thought it was a bad idea to wait any longer.
“The reason for moving forward is to address an important item,” said board member Brenda Worob, referring to the boilers.
Plus, part of the original $30 million bond that the previous board borrowed to fund a consolidated school needs to be spent soon, Hellmann said.
Board member William Farrell suggested the district not delay the boiler project just because it would take a long time. Maybe the district wouldn’t complete it in time for this year’s cold season, but at least the preparation work would be done, he said.
As for the second elementary school, M. R. Reiter, Lastichen didn’t think it was worth investing in a new boiler, though residents complained that it was too cold for comfort there during the winter.
“Reiter’s so bad, I think it should be bulldozed. I wouldn’t spend money on it,” Lastichen said during the meeting.
M.R. Reiter’s future is still up in the air.
In May, Hellmann unveiled a tentative plan to save money by combining the schools somehow, but no clear action has been taken in that direction yet.
A temporary fix for providing heat in the winter may be to bring modular heaters into Reiter and the other schools, said board member John Buckman.
The district will hold a community action plan meeting at 7 p.m. July 22, in the LGI room of the high school to discuss the boilers and other issues. Residents are encouraged to participate.
District takes steps toward restoring schools
By MANASEE WAGH
After several decades, it’s time to initiate serious updates in Morrisville schools, say area residents.
The school board recently voted 7-1 to start preliminary work to replace the boilers in the high school building and Grandview Elementary.
Some school board members and residents call it the first step toward restoring the schools, which have been in need of repairs for years.
“This is the beginning of something. People should applaud this beginning,” said resident Sharon Hughes.
The district will use Vitetta, a Philadelphia-based architectural and engineering corporation, to begin assessing the work necessary to replace the boilers, as well as looking into two new burners for the elementary school.
Morrisville residents have been calling for a plan to get the deteriorating high school and both elementaries in better shape since the current board canceled plans to build a consolidated K-12 school.
But there’s a problem with taking action on the boilers now, the board minority said.
Evaluating the needs of two schools, designing a custom boiler for each and completing installation could take six months. That would put the project’s conclusion well into the heating season, according to Tim Lastichen, district facilities director.
The price tag for the boilers alone is more than $100,000, not counting the labor and any expenses that could crop up along the way, he said at the Tuesday board meeting.
Some residents and the board minority complained this is a poor time to start an expensive project without a long-term restoration plan that would take the schools’ many other problems into account.
In May, the board voted to hire Wick Fisher White, an engineering firm, to do a $30,000 study of the work needed at the high school and two elementaries. The next step was to advertise for several companies to do that work.
On June, 12 companies submitted proposals to work on all three school buildings. Bill Hellmann, the board president, later cut that down to five and removed M. R. Reiter from the equation without consulting the rest of the board, said board member Robin Reithmeyer at Tuesday’s board meeting.
She voted against going forward on the boiler replacements without a plan that included all three schools.
However, some board members and residents attending the meeting thought it was a bad idea to wait any longer.
“The reason for moving forward is to address an important item,” said board member Brenda Worob, referring to the boilers.
Plus, part of the original $30 million bond that the previous board borrowed to fund a consolidated school needs to be spent soon, Hellmann said.
Board member William Farrell suggested the district not delay the boiler project just because it would take a long time. Maybe the district wouldn’t complete it in time for this year’s cold season, but at least the preparation work would be done, he said.
As for the second elementary school, M. R. Reiter, Lastichen didn’t think it was worth investing in a new boiler, though residents complained that it was too cold for comfort there during the winter.
“Reiter’s so bad, I think it should be bulldozed. I wouldn’t spend money on it,” Lastichen said during the meeting.
M.R. Reiter’s future is still up in the air.
In May, Hellmann unveiled a tentative plan to save money by combining the schools somehow, but no clear action has been taken in that direction yet.
A temporary fix for providing heat in the winter may be to bring modular heaters into Reiter and the other schools, said board member John Buckman.
The district will hold a community action plan meeting at 7 p.m. July 22, in the LGI room of the high school to discuss the boilers and other issues. Residents are encouraged to participate.